Loading the Tekla model…
Tekla modelSingle-span portal frameDrag to turn
- Sector
- Industrial
- Location
- Astley, Wigan
- Role
- Structural steel detailing
- Year
- 2025
- Tonnage
- 112 tonnes
We detailed the steelwork for F.H. Dale on Unit 3 at Astley Business Park, built by TanRo Construction: a single-span portal frame in 112 tonnes of hot-rolled steel and 30 tonnes of cold-rolled.
